| It was a dirty job, but somebody had to get soaked in oil, covered in sawdust and stuffed in a garbage can. RIP cookie monster towel! |
But instead of the natural inclination to just go ahead anyway, we decided to consult the Home Depot website to check on timing of coats. We browsed around for a few minutes but could not find the item we purchased. Apparently they had dissavowed all knowledge of Minwax 2.5 Gallon (or any other size) High-Build Polyurethane Semi-Gloss since our purchase. After much hunting we found something we thought comparable that claimed one could put down a second coat after 5 hours or when no longer tacky. Thus we set out: start varnishing at 3PM, put down second coat by 9PM and be done by 10.